Start here / 8 minute read
Northstar walkthrough
Review a sample client project, check the answer, and reuse the review for another project.
Last verified 2026-11-10How Elyxis works in this walkthrough
Elyxis turns a request in plain language into work you can run again. You type the request in the CLI. The Assistant looks for an Agent that can do the job in your selected Environment. When it needs to build one, it can prepare an Agent using the connections and tools available there.
The Ready to explore Environment already has access to the fictional Northstar records. Your first request asks for an onboarding review of Willowbrook at a specific date and time. Elyxis can save the review as an Agent and run it with the project name and cutoff you supplied. A later request can run the same review for Cedarbridge or use an earlier cutoff for Willowbrook.
The Agent is the saved work. The review and follow-up draft you see in the CLI are the result of one run. These exercises can create Agents in Elyxis. They read the sample business records and return unsent drafts for you to review. See how Elyxis builds and runs the review.
What to expect
Follow the example to see how Elyxis checks a project against the sample records, reuses the Agent with different inputs, and runs a separate budget review. The recorded demo shows the onboarding review and its result.
- To run the exercises yourself, you need the Elyxis CLI, an existing Elyxis account, and access to the Ready to explore sample Environment. That Environment supplies the database and model configuration.
- A first build includes preparation that later runs can skip. The reading time above covers the guide itself.
Use the supplied fictional records for the walkthrough. Check Data and access before connecting company information.
Open any step to jump to it, or use Next and Back to work through the guide.
Extract your Elyxis CLI package and run the executable in a terminal. Follow the launch commands for your operating system. The package is already configured to connect to Elyxis.
At the Elyxis > prompt, enter:
/login
Keep the terminal open. Sign in in the browser with the email address associated with your Elyxis account, choose your workspace if prompted, and review the CLI permissions if shown. When the browser tells you to return to the terminal, look for Logged in to Elyxis. For help with the browser flow, see the sign-in guide.
Choose Ready to explore in the Environment picker. If the CLI selects your only available Environment automatically, check its name:
/context
Ready to explore already has the Northstar sample data, MongoDB connection, and model configuration. You can start without a database URL or an OpenAI API key.
The CLI still uses App in technical resource labels, App ID for the resource identifier, and List all apps. for the inventory request. This guide calls that saved business work an Agent.
Ask the Assistant what is available in the selected Environment:
List all apps.
An empty Agent list is expected on a fresh setup. The records and connections are already in place so Elyxis can use them when it builds a review Agent. If Agents already exist, note their names or IDs so you can compare the list after each exercise.
Northstar is a fictional consulting firm. Start with a question about one of its client projects. Give Elyxis the project name and the time you want to review. Paste this as one request at the Elyxis > prompt. If your terminal submits pasted lines separately, enter /paste first and /send on its own line afterward.
Review Willowbrook Service Desk Onboarding as of noon UTC on October 14, 2026.
Identify missing client documents, internal approvals, and blocked work separately.
Name the responsible people and cite the supporting record IDs.
Use the latest inbound client communication to draft a concise follow-up.
Do not send it or change the business records.
What to look for in the CLI
- Question. The Assistant needs a detail to continue. Answer it in the terminal.
- Confirmation. Check the proposed action and Environment. Approve only if the action matches the exercise, such as creating the review Agent in Ready to explore. Reject any proposal to change business records or send a message.
- Build. Elyxis has prepared the Agent. If the turn ends after reporting the build, use the follow-up below to run it.
- Result. Look for the actual findings and draft in the reply. The recorded CLI demo shows the Willowbrook result and draft from about 0:29 to 0:55. Waiting time is sped up in the recording.
If the Agent was built and the review is missing, enter this follow-up.
Run the onboarding review Agent you just built for Willowbrook Service Desk Onboarding as of noon UTC on October 14, 2026. Include the findings, supporting record IDs, and an unsent follow-up draft. Leave business records unchanged.
Note the App ID if the CLI shows it for this run. If you don’t see it, enter this follow-up before making other requests.
Which Agent ran for the Willowbrook review? Show its App ID and any available execution reference. Say if you can’t tell from the run.
In the response, check the project name, cutoff, and cited document IDs. A document received by the cutoff with approval still pending belongs with internal approvals. A document received after the cutoff could still have been due from the client at that earlier time. If the records lack dates or status history, look for the review to say what it could establish from the available evidence.
Compare with the supplied baseline
Your answer can use different wording. For PRJ-002 at October 14, 2026, 12:00 UTC, check these facts:
Scroll sideways to see all columns.
| Record | Expected finding | Who acts next |
|---|---|---|
| DOC-005, signed statement of work | Missing from the client. | Noah Patel follows up with Jordan Reed. |
| DOC-007, service desk access authorization | Missing from the client. | Noah follows up with Jordan for the authorization. |
| DOC-006, requirements pack | Received October 12; internal approval is pending. Do not ask the client to resend it. | Noah handles the internal approval. |
| COM-005, latest inbound client message | Jordan's October 12 reply supports the follow-up. | The draft asks for the two missing items; nothing is sent. |
These are sample-data expectations, not a transcript of a new run. If your records differ, report the difference instead of changing them to match.
To inspect the evidence, ask:
Show the source records DOC-005, DOC-006, DOC-007, and COM-005 for Willowbrook.
Include their dates and status so I can check the review. Do not change records.
Compare those records with the review. If Elyxis only gives another summary without enough source detail, include that in your feedback.
Then check the Agent inventory again:
List all apps.
On a fresh setup, look for one new onboarding review Agent. Note its name or ID for the inventory comparison. Elyxis chooses the name.
Change the project. Stay in Ready to explore and keep the same cutoff. The same onboarding review Agent can use Cedarbridge as its project input.
What was holding up Cedarbridge ERP Integration as of noon UTC on October 14, 2026? Tell me which documents we were still waiting for from the client, which internal approvals were pending, what work was blocked, and who was responsible for each item. Include the relevant record IDs and use the latest message from the client at that point to draft a follow-up email. Leave the email unsent and the business records unchanged.
For PRJ-001 at October 14, 2026, 12:00 UTC, check that the source-to-target mapping workbook (DOC-002) is missing and there are no pending internal approvals. The draft should ask for the workbook and use COM-002, the latest inbound message by the cutoff.
Note the App ID shown for the Cedarbridge run. If it’s missing, enter this follow-up.
Which Agent ran for the Cedarbridge review? Show its App ID and any available execution reference. Say if you can’t tell from the run.
Matching App IDs from the two runs show that the Agent was reused. If either run lacks evidence of which Agent ran, record reuse as unverified.
List all apps.
Compare the inventory with the list after Willowbrook. An unchanged list tells you that no new Agent appeared. If another Agent appears, include both lists in your feedback.
Change the cutoff. Return to Willowbrook and ask for the same review at an earlier date. The sample data uses fixed dates, so include the date, time, and time zone in your request.
Run the same onboarding review for Willowbrook Service Desk Onboarding as of noon UTC on October 11, 2026. Include the supporting record IDs and an unsent follow-up draft. Do not change business records.
Compare these facts with the October 14 review. Check the recorded dates for what was true at noon UTC on October 11.
- DOC-006 was still missing. It arrived on October 12, so the earlier draft should ask for it.
- No inbound client message was available by the earlier cutoff. The draft should use the records available then. Jordan’s reply (COM-005) arrived on October 12.
Run List all apps. again and check whether the list changed.
Change the task. Checking project spending and forecasting the final cost requires different work from reviewing onboarding documents. Elyxis can build and run a separate Agent for this review.
How is Summitfield Analytics Rollout tracking against its budget as of noon UTC on October 14, 2026?
How much did we approve, how much have we spent so far, and how much do we expect to spend by the end? Tell me how far over or under budget we expect to land, in Canadian dollars and as a percentage of the approved budget.
Check the project messages for any changes to the work and tell me what decision we need to make. Include the record IDs you relied on. Just give me the review here without changing business records or sending a message.
If Elyxis asks how to convert amounts, tell it to use the amounts recorded in CAD and flag any other currencies without converting them.
The review uses the project's recorded costs and messages through the cutoff. If Elyxis reports only that it built the Agent, ask it to run the Agent for Summitfield at the same cutoff.
Check the budget result
For PRJ-004, the supplied baseline records these amounts in CAD:
Scroll sideways to see all columns.
| Measure | Amount | Meaning |
|---|---|---|
| Approved budget | CAD 100,000 | The amount authorized for the project. |
| Actual spending | CAD 76,000 | What has been spent so far. |
| Forecast total | CAD 125,000 | Expected total spending by completion, including spending so far. |
| Forecast overrun | CAD 25,000 / 25% | The expected amount above the approved budget. |
The calculation is 125,000 − 100,000 = 25,000, then 25,000 ÷ 100,000 × 100 = 25%. Do not add actual spending to the forecast total. The project has a forecast risk; it has not already spent more than its approved budget.
Look for COM-011 and COM-012 supporting a scope or budget decision. The records describe additional scope without an approved budget increase. Liam Okafor needs a decision from Taylor Brooks. Ask to see those source records if you want to check the recommendation.
List all apps.
After a successful second build, look for both the onboarding review Agent and the budget review Agent in the same Environment.
What you accomplished
You are done when you have:
- reviewed Willowbrook and checked the missing documents against the source records;
- tried Cedarbridge and noted whether the same Agent ran;
- compared the earlier Willowbrook cutoff;
- checked the difference between Summitfield's spending and forecast; and
- recorded what worked, failed, or needed help.
A failed or unclear result is useful feedback too. You do not need to configure credentials or pass the optional accuracy checks to finish this session.
Share useful feedback
Email contact@elyxis.io with the Environment, the prompt you entered, the time of the attempt, and what you expected and observed. If an unexpected Agent appeared, include the output of List all apps. from before and after the request. A screenshot or short recording can help show a missing citation, an unexpected Agent build, a result that ignored the date, or a step that was hard to follow. Tell us what worked, too.
Keep credentials, tokens, and the local CLI credential file out of your feedback. Use the same address if you need help restoring the sample setup.